Stand builders unload the lorry at the loading bay of an exhibition centre (AI-generated image)

Stands in Catalonia

Barcelona, Girona, Lleida and Tarragona

For Fira de Barcelona, the CCIB and venues across Catalonia. We build it in Cornellà and install it at the venue.

Tell us about your projectWe reply within 24 hours

What we do in Catalonia

  • Design and drawings for Fira de Barcelona
  • Fabrication in Cornellà, with no long trips or hotels
  • Build-up and breakdown within the venue's hours

The venues, their rules and their trade fairs

Fira de Barcelona, Gran Via L'Hospitalet de Llobregat

Walls and ceilings
C-s2,d0 (UNE-EN 13501-1) §1.4, p. 6
Floor
Efl §1.4, p. 6
Hanging textiles
Class 1 (UNE-EN 13773) §1.2 and §1.4
Certificates
From an accredited laboratory and less than five years old. Fira may ask for them §1.4, p. 6
Height
5 m, and 4 m in some areas. Above that, a complex structure with a technician §3.3.1 and §3.4
Platform and ramp
Platform 18 cm high at most. From 5 cm, a ramp 1 m wide (1.20 m under DB-SUA) §3.3.3 and §5.8
Ceiling
Never fully closed. If it traps smoke, one detector every 60 m² §3.3.2 and §5.9
Electricity
Authorised installer's certificate, an engineer's design from 50 kW and a 30 mA RCD §6.2 and §6.5
Hanging from the ceiling
Only through Fira's service, up to 150 or 250 kg per point and 15 kg/m² §3.7.1
Deadlines
Stand plans in advance, and services two weeks before build-up §3.3, §5.1 and §6.4
Documents
Signed occupational risk form and passes with ID §2.1
Hall floor
Platform or carpet only, no paint or glue. Tape is removed at breakdown §3.1.1 and §7.2
Waste
Removed every day. If the space is not left clean, the exhibitor pays for cleaning §7.2
Prohibited
Drilling, screwing or nailing into the venue. The stand must be self-supporting §3.1.1 and §5.7

Source: Normativa Tècnica Fira de Barcelona Gran Via

Trade fairs

  • MWC Barcelona Telecommunications March
  • 4YFN Startups March
  • ISE Audiovisual and systems integration February
  • ICE Gaming and betting January
  • Alimentaria Food and drink March
  • Hostelco Hospitality equipment March
  • Seafood Expo Global & Seafood Processing Global Seafood April
  • Advanced Factories Industrial automation and robotics March
  • Advanced Machine Tools Machine tools March
  • Vitafoods Europe Nutraceuticals May
  • Professional Beauty Professional beauty April
  • In-cosmetics Global Cosmetic ingredients April
  • Fespa Global Print Expo Printing May
  • Expoquimia Chemical industry June
  • Equiplast Plastics and rubber June
  • Hispack Packaging May
  • Graphispag Graphic arts May
  • Construmat Construction May
  • Shoptalk Europe Retail June
  • SIL Barcelona Logistics June
  • Smart City Expo World Congress Cities and urban infrastructure November
  • Barcelona Cybersecurity Congress Cybersecurity November
  • Ibtm World Business travel and conferences November
  • EFINTEC Installers October
  • Caravaning Caravaning October
  • Piscina Barcelona Pools and outdoor spaces November
  • Gastronomic Forum Barcelona Food service and gastronomy October
  • Battery & ES Tech Europe Batteries and energy storage September

Fira de Barcelona, Montjuïc Barcelona

Walls and ceilings
C-s2,d0 §1.4, p. 6
Floor
Efl §1.4, p. 6
Hanging textiles
Class 1 §1.2 and §1.4
Height
5 m. Above that, a complex structure §3.3.1
Platform and ramp
Platform 18 cm high at most. From 5 cm, a ramp 1 m wide §3.3.3 and §5.8
Hanging from the ceiling
Through Fira's service, up to 150 kg per point and 15 kg/m² §3.7.1
Prohibited
Drilling, screwing or nailing. On the floor, platform or carpet only §3.1.1

Source: Technical Regulations Fira de Barcelona Montjuïc

Trade fairs

  • Barcelona Wine Week Wine February
  • Talent Arena Digital talent March
  • Saló de l'Ensenyament Education March
  • B-Travel Tourism March
  • Automobile Barcelona Automotive April
  • Barcelona Bridal Fashion Week Bridal fashion April
  • Comic Barcelona Comics May
  • Erospain Adult industry May
  • Barcelona Textile Expo Professional textiles October
  • Souvenir Expo Spain Souvenirs and tourist gifts January
  • EdTech Congress Barcelona Education and technology February
  • Saló de l'Ocupació Jobs October
  • Saló del Comerç Local retail October
  • SAGA Barcelona Game Fest Video games October
  • AMT Advanced Maritime Technology Maritime technology June

CCIB Barcelona

Documents
Safety rules signed by each company before entry. Accredited staff only pp. 1-2
Prohibited
Ladders above 5 m and dismantling by hammering pp. 1-2
Stand build-up
Each congress organiser issues the rules

Source: Normas de seguridad en las instalaciones del CCIB (Fira CCIB, S.L.). The stand-building rules are not on the CCIB website

Trade fairs

  • CineEurope Cinema June
  • Global ABS Conference Structured finance June
  • Gartner Supply Chain Symposium/Xpo Supply chain May
  • OCP EMEA Summit Data centres April
  • EORTC-NCI-AACR Symposium Medical congress November
  • EACTS Annual Meeting Medical congress October
  • World Green Infrastructure Congress Green infrastructure October
  • AVEPA-SEVC Congress Veterinary congress November

Fira de Girona Girona

Fire
Nothing easily combustible. No Euroclass specified art. 26.2
Height
2.50 m, and up to 4 m for custom-built stands art. 28, 29 and 33
Backs of walls
Finished like the inside, with no logos art. 31 and 33
Deadlines
Stand plans approved before build-up, and works two weeks before art. 27 and 33
Electricity
Authorised installer, a design from 50 kW and 30 mA on lighting art. 35.1
Carpet
By its own weight or with removable double-sided tape art. 27
Documents
The stand builder's public liability insurance and risk prevention art. 23 and 26

Source: Normes Generals de Participació (Fundació Fira de Girona)

Trade fairs

  • Fira de Mostres de Girona Multi-sector October and November
  • Saló Expojove April
  • Fòrum Gastronòmic Girona Gastronomy February
  • GiroCòmic Comics October
  • La Girotrònica November
  • Formatgem Cheese March

firaReus Reus

The venue does not publish stand-building rules. Each show's organiser issues them.

Trade fairs

  • Fira ÀPAT Costa Daurada i Terres de l'Ebre November

How we comply

  • Fire. B-s1,d0 fire-retardant board and Bfl-s1 carpet. Both are accepted at all these venues, and also at IFEMA's Palacio Municipal, which is the strictest.
  • Certificates. Each material comes with its declaration of performance and classification report, and we hand them over with the stand's spec sheet.
  • Electricity. Halogen-free RZ1-K (AS) cable, class Cca-s1b,d1,a1, and an authorised installer's certificate.
  • Height and ramps. We design within each venue's height limit, and the platform has a ramp as wide as the venue requires.
  • Deadlines. We send you the dimensioned plan, elevations and perspective before the venue's deadline.
  • Batteries. VR headsets, tablets and tools are charged outside the venue.
  • Waste. We separate wood, metal and textiles, and at breakdown we take everything away.

The materials and their data sheets

Questions

What reaction to fire does Fira de Barcelona require?

C-s2,d0 on walls and ceilings and Efl on the floor, with a certificate less than five years old from an accredited laboratory (Fira de Barcelona technical regulations, §1.4).

How high can you build at Fira de Barcelona?

Up to 5 metres, and 4 in some areas of Gran Via. Above that, it counts as a complex structure and needs a technician (§3.3.1 and §3.4).

Can you hang anything from the ceiling at Fira de Barcelona?

Only through Fira's own service, up to 150 or 250 kg per point depending on the hall, and 15 kg per m² (§3.7.1).

Projects

Which show are you exhibiting at?

Tell us about your project We reply within 24 hours